Wind farms

ATS Groep has completed windfarm projects for various Belgian energy suppliers.

ATS takes responsibility for the full configuration of the medium voltage substations.

This work took place entirely in the panel construction workshop, so all safety devices and cabling could be controlled and tested beforehand.

On the site itself a further number of cables were laid between the wind turbines and medium voltage substation.

ATS also completed the glass fibre cabling and testing. One farm that stands out has seven wind turbines with a maximum production capacity of 16.1 MVA.

The power cables run over a length of 16.6 km, with a glass fibre communication network between all seven wind turbines.
 